AN/ALE-47 countermeasures dispense system (CMDS). 6. Requirements for this development are as follows: Kominis, I., Kornack, T., Allred, J. et al. Transparent Battlefield requires advanced spectrum situational awareness to enable first identification of threats and prevent adversaries from gaining an advantage. Prepare a Phase III development plan to transition the technology to Marine Corps use. KEYWORDS: Microwave Oscillators; Microwave Amplifiers; Radio Frequency Generators; Radio Frequency Amplifiers; Radio Frequency Spectroscopy; Atomic Spectroscopy; Molecular Spectroscopy; Quantum Information, OUSD (R&E) CRITICAL TECHNOLOGY AREA(S): Quantum Science This error code would occur if you tried to suspend or resume a connection that was disconnected. A. Lazar and L. T. Toth, "Time encoding and perfect recovery of bandlimited signals," 2003 IEEE International Conference on Acoustics, Speech, and Signal Processing, 2003. The documentation provided must validate that the proposer has completed development of technology as stated in Phase I above. d. Reverse Engineering (RE) without RPPOB or Surplus available is when the NSN will be provided as Government Furnished Material (GFM) if available from the ESA or one of our Service customers post award. 3. The objective of this USSOCOM Phase I SBIR effort is to conduct and document the results of a thorough feasibility study (Technology Readiness Level 3) to investigate what is in the art of the possible within the given trade space that will satisfy a needed technology. https://www.esd.whs.mil/portals/54/documents/dd/issuances/dodm/522022m.pdf The base portion of Phase II will develop a device that can operate as a GG in the presence of motion. Perhaps it is an improper setup by the client, but at this point I cannot assure the client of timely responses to any problem they have due to their use of the terrible VPN, YMMV, but I have grown to hate this VPN. REFERENCES: REFERENCES: Optics Express. United States Nuclear Regulatory Commission [2] maintains requirements for criticality safety in operational facilities, and there are commercially available systems* for monitoring criticality safety, such as [3]. b. 17. Joint publication 3-85: Joint electromagnetic spectrum operations. o Micro SD Card slot with 1TB support The two sensors provide a powerful combination that allows for target identification and geolocation, leveraging the best information each sensor. Validate and verify the overall accuracy of software tools based on the performance metrics detailed for Phase I in addition to the following performance enhancement metrics. This cost grows very large when considering the large quantity and variety of users, such as active-duty military, guard, reserves, civilians and contractors that utilize Army resources. PHASE III DUAL USE APPLICATIONS: Complete final testing, and perform necessary integration and transition for use in landing/take-off operations with appropriate existing platforms and agencies, and future combat systems under development. Develop geospatial models to represent the physical space and location of the entities and sensors with spatiotemporal ontologies expressing contextual information. By increasing the revisit rates to multiple revisits per day information characterizing rapid change or unusual activity can be captured. PHASE III DUAL USE APPLICATIONS: This technology can be used for multiple military technologies such as magnetic anomaly detection or magnetic navigation but has a dual use for medical applications such as magnetoencephalography or magnetocardiography. As a consequence, dual use opportunities exist for military and civilian applications where there is a need for, as examples, network health monitoring with self-healing, auto-drive, autonomous landing and docking, and collision avoidance. M. Kurchuk, C. Weltin-Wu, D. Morche, and Y. Tsividis, Event-Driven GHz-Range Continuous-Time Digital Signal Processor with Activity-Dependent Power Dissipation, IEEE Journal of Solid-State Circuits, vol. o AES 256 encryption If you want a Web install that has customized settings, you can do any of the following: Note: A Pulse installation causes a restart of active network connections on a Windows endpoint. MANET Radio At the end of Phase II a subset of the system should be operational and demonstrated to provide detection to benchmark results from the Phase I simulation. Battery drain should be removed from the Pixel Launcher entirely while other issues should be resolved. OUSD (R&E) CRITICAL TECHNOLOGY AREA(S): Space Technology;Trusted AI and Autonomy Phase II Machine Performance Accuracy: Structured Data Translation and Distillation - Accuracy 95% over 95% captured content; Unstructured Data Translation and Distillation Accuracy 90% over 95% captured content. Phillips, A. S. (2011). Any other type of funding is allowed. Erwin, Sandra. The physiology and pathology of blast injuries have been thoroughly studied. Those deviations will be addressed post award Additional class(es) of threats will be assessed based on how well it demonstrates an extension of the base algorithms, as well as how different the class(es) of threat(s) is(are) from the original class used in Phase I. Algorithms will be assessed based on effectiveness criteria mentioned above, as well as ease and speed of algorithm retraining. Prototype will demonstrate downstream capability to network with program of record exercise control systems in distributed manner (i.e., multiple devices can be controlled at once), and provide sense/replay capabilities (if applicable) to be executed within training-relevant timelines (i.e., processing for replay fast enough to enable tactical mimic of signals). Work in Phase II may become classified. DESCRIPTION: The Navy relies on a mixture of space-based and tactical air/surface ISR platforms to maintain enhanced battlespace awareness in contested operating areas. https://www.esd.whs.mil/portals/54/documents/dd/issuances/dodi/850001_2014.pdf The objective is to develop an innovative multiband antenna whose directionality is governed by a virtual gimbal to help reduce incidences of mechanical failure and broaden the pool of available data. By enhancing satellite data, orthorectification, and georectification algorithms, the observation cone can be increased allowing for a wider FOR with validated accuracy. Further, older antennae may not be equipped to receive at frequencies commonly used by the legacy as well as the latest generation meteorological satellites (typically L through X bands). As pertinent to the Phase II prototype, offerors should also examine and rate leading human physiology engines on their ability to simulate physiological reactions to extreme cold. 882-885 (2015). 5. (2019, October 7). The current maximum data rate to the aircraft is 320 Kbps in one channel located in the 136 MHz-170 MHz VHF band. Hopefully, the provider will patch its service soon. DESCRIPTION: Current Field of Regard (FOR) limits the taskability for commercial assets to 30 due to the spatial resolution on the extreme slants. 2. Systems that generate in-scene reference plumes should be capable of using DIMP or other common simulant materials. First of all, you can reach the Pulse Secure support team over the phone 24/7/365. Additional applications of this work would exist for any agency performing disaster recovery missions or other functions requiring actionable information on infrastructure. To accomplish this, the ratio of the rf voltage amplitude to the drive frequency should vary by less than 1 x 10^-5 if the ambient air temperature varies by +/- 3 C. This stability should also be maintained if the device is subjected to acoustic noise in the audio range at levels of approximately 60 dB. 4. https://apps.dtic.mil/sti/pdfs/AD0857062.pdf Binte A, E Attia, G Balasundaram, M Moothanchery, US Dinisha, R Bi, V Ntziachristos M Olivoa, A review of clinical photoacoustic imaging: Current and future trends, Photoacoustics 16, 100144 (2019) The final deliverable will be a white paper on the design of the surrogate. Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the technical data under US Export Control Laws. The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), 22 CFR Parts 120-130, which controls the export and import of defense-related material and services, including export of sensitive technical data, or the Export Administration Regulation (EAR), 15 CFR Parts 730-774, which controls dual use items. PHASE III DUAL USE APPLICATIONS: Expand the scope of this software package for refining by mining and processing industry. Additional details will be provided to firm once selected. Candidates should strive to achieve a minimum acceptable NEDP of 1%. 11. 3. Ideally to look for a low cost and automated data flow using AWS/GCP cloud infrastructure. https://poweroferdcpodcast.org/tag/virtual-testbed-for-installation-mission-effectiveness/ 12. EPJ Quantum Technol. Construct and demonstrate a working prototype imaging system using the design developed in Phase I. KEYWORDS: Medical modeling and simulation, extreme weather medical training, cold weather medical training, OUSD (R&E) CRITICAL TECHNOLOGY AREA(S): Nuclear, Mission Readiness & Disaster Preparedness The third deliverable is to provide one fully functional prototype, accompanied by validation test reports and other relevant reports and designs, and a proposed regulatory strategy that includes a clear plan on how FDA clearance will be obtained. Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the technical data under US Export Control Laws. The Pulse Client creates a secure connection to your corporate Pulse Connect Secure SSL VPN gateway to provide instant access to business applications and data from. Both the back-lit and non-back-lit, transparent displays should interface with printed-circuit driver boards that will be developed and fabricated by the awardee as part of this SBIR topic. Software development to increase the extent of off-nadir collections and positional accuracy of the AOI can increase the taskability and revisit rate of commercial assets to support DoD missions. - Refresh Rate: > = 240 frames per second 1. De Clercq and Verbauwhede [6] have recommended more hardware based security over software. The entire Tasking, Collection, Processing, Exploitation, and Dissemination (TCPED) process should be automated using Artificial intelligence (AI) and machine learning (ML) algorithms to improve the response times to request rerouting opportunities. NATO has established a group to push this effort but the funding from NATO is very limited. 5. 10.1117/12.488931. Siverns, J.D., Simkins, L.R., Weidt, S. et al. 11. Offerors must disclose any proposed use of foreign nationals (FNs), their country(ies) of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with the Announcement. The objective of this USSOCOM Phase I SBIR effort is to conduct and document the results of a thorough feasibility study (Technology Readiness Level 3) to investigate what is in the art of the possible within the given trade space that will satisfy a needed technology. Validation criteria include accuracy, latency, and processing time. Dual use applications may include light metal repairs in the aviation industry. (5) The performer will provide a final report detailing the technology developed and its performance based on simulation and measured results. (6) propose a Future Tactical UAS application for continuous time spectrum situational awareness. .admin-menu.alert-message { padding-top:25px !important;} Bertin, J. J., & Cummings, R. M. (2006). The most common limitation of digital communications is the amount of RF Bandwidth available to be used to reliably transmit the data at higher and higher data rates. Ben-Moshe, B., Power Line Charging Mechanism for Drones, Drones, October 2021. 2741, pp. Individual photodetector designs are acceptable for each wavelength band. United States, The Pulse Launcher program, pulselauncher.exe, is installed as part of a Pulse client installation in, Include a call to the Pulse Launcher executable, pulselauncher. The micro-displays should be grayscale-only and capable of supporting and implementing 8-bit grayscale values with the option to potentially support 16-bit values. Conduct successful benchtop functionality test consisting of a standalone computer for visualization, sequencing computer, MinIon reader, and pre-prepared reagent sample. Pulse Collaboration. 1. The rotating gimbal is a common point of mechanical failure for these antennae. OBJECTIVE: Machine reasoning logic and semantic interoperability for contextual understanding, auto-alert cuing, and drilldown of anomalous events and activities in multidomain littoral zones. To reduce the negative effects and influence of adversarial participants in the network interaction, the Navy requires the development and demonstration of a highly-secured, decentralized, permissionless, and immutable network system protocol to integrate with the manned aerial platform's Multifunction Advanced Data Link (MADL). PHASE I: Not to exceed - 12 months - $100K Instead, law enforcement bases the serviceability of a plate based on its recommended shelf life. https://vtol.org/store/product/eliminating-avoidable-helicopter-seatingrelated-injuries-to-improve-combat-readiness-and-mission-effectiveness-9482.cfm-injuries-to-improve-combat-readiness-and-mission-effectiveness-9482.cfm OBJECTIVE: Develop a low cost, portable solution to detect cracks and delamination in Enhanced Small Arms Protective Insert (ESAPI) and Lightweight Plate (LWP) hard armor plate systems. Phys. Apply the developed tool sets to a canonical, Navy-relevant hypersonic vehicle geometry in order to validate physical models and build confidence in predictive capability. Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the technical data under US Export Control Laws. ncLVSM use when mounted on an UAV, to provide an unmanned triage capability, is another application for both the military and civilian markets. KB41052 - Safari 11 is unable to launch Pulse Secure component using Pulse Secure Application Launcher (PSAL) due to Allow prompt for PulseApplicationLauncher.app disappearing too quickly KB40455 - Automatically authorize or re-authorize external protocol request message for Pulse Secure Application Launcher (PSAL) with Google Chrome browser As such, no human research will be allowed until Phase II and work will not be authorized until approval has been obtained, typically as an option to be exercised during Phase II. I have to use a wide array of VPNs as each of my clients has their own particular one they use. A new commercially available power source would change logistical control and open additional procurement availability to fleet maintainers. with MIL and/or DoD Specification lubricants. Installing Pulse Client using Pulse Secure Application Launcher for the first time using Safari (macOS): Login to the PCS server using the user name and password given by the administrator. 1. Phase I Base amount must not exceed $295,000 for a 12-month period of performance. 2. Integrate the DTRA OI-CO BWA library into the sequencers computer. U.S. Army Engineer Research and Development Center. KEYWORDS: Photonic integrated circuits; optical; isolation; magneto-optics; spatio-temporal; telecom; photonics, OUSD (R&E) CRITICAL TECHNOLOGY AREA(S): Microelectronics;Nuclear;Space Technology Demonstrate the feasibility of the solution and delay time of effective operation from activation. Because of the limitation of our current capability, we are not able to answer the questions and constantly disappoint the customers. The development of trapped ion systems is aligned with DoD goals to develop quantum information technology to enhance position, navigation, timing, and secure communication. Remote Sensing of the Atmosphere, Ocean, and Space, April 2003. doi: 10.1117/12.466347 Grenade, Weapon) Verification and validation should also include testing with both wet and dry aerosol particles, as well as testing under day and night time lighting conditions. Determined the technical feasibility to incorporate performance assessment capabilities for After Action Review (AAR). This phase entails: The research can be transitioned for the use of entangled photon generation for quantum communication, quantum networking, entanglement distribution, and quantum computing. Offerors must disclose any proposed use of foreign nationals (FNs), their country(ies) of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with the Announcement. The main goal of this SBIR topic is to design and develop a low-latency and high-reliability communication blockchain-based network protocol, while taking into account the specifics of the network, the high dynamics of network topology changes and the exchange of large numbers of data. It is now a valuable resource for people who want to make the most of their mobile devices, from customizing the look and feel to adding new functionality. Note: The prospective contractor(s) must be U.S. owned and operated with no foreign influence as defined by DoD 5220.22-M, National Industrial Security Program Operating Manual, unless acceptable mitigating procedures can and have been implemented and approved by the Defense Counterintelligence and Security Agency (DCSA) formerly Defense Security Service (DSS). https://dukespace.lib.duke.edu/dspace/handle/10161/6148; primary care physicians, clinics, and EMT use. Once validated conceptually and technically, demonstrate dual use applications of this technology in the financial/banking sectors and relevant data centers. o Current SIM/s status DESCRIPTION: : Competitive applicants must have the manufacturing capability to produce ball bearings and roller bearings for aerospace applications along with appropriate quality credentials (AS9100, Nadcap, ISO 9001). Proceedings., Apr. Urzay, J. It consists of 3 major parts: (i) position, velocity, and pointing data from the satellite to coarsely locate the image; (ii) georectification to take the image and match it to landmarks and identifiable features; and (iii) orthorectification to remove sensor, terrain, atmospheric, and terrain related geometric distortions. For example, EM Signals will match characteristics of realistic operational equipment (i.e., signal waveform) at an acceptable emission power level that will allow training range or home station EW sensing training (Order of Magnitude emission power 1-50 Watts). Hardware will demonstrate ability to receive control messaging with existing exercise control (EXCON) systems via stakeholder selected IP-based messaging protocol to enable centralized control of many devices from a central EXCON station. Pulse Application Launcher supports delivery & installation of following Components: Terminal Services Premiere JAVA Applet (HOB Applet). Department of Defense. 87, 637 (2015). The InfraScan (InfraScan Inc. Philadelphia PA), are limited to a single optode for signal acquisition from a single head location at a time, and require repeated scalp contact [5]. Possible alternatives such as liquid mixtures or mineral carbonization could be evaluated. https://doi.org/10.1007/s10916-019-1186-8. PHASE II: This project will develop a laboratory prototype device (not necessarily a quarter wave helical resonator) that results in an applied rf field to an ion trap where a trapped ions secular frequency should be stable. Phase III proposals will be accepted after the completion of Phase I and or Phase II projects. AS-3 Fiber Optics and Applied Photonics Committee. This SBIR topic seeks to develop a prototype, dual-mode surrogate seeker, having both a passive RF sensor and a passive imaging IR sensor, for field test evaluation purposes. These items may also require a qualification of a Representative Article. 2. News Desk, BlackSky achieves worlds highest revisit, time-diverse dawn-to-dusk satellite constellation with three successful launches in three weeks, Geospatial World, 14-Dec 2021. https://www.geospatialworld.net/news/blacksky-achieves-worlds-highest-revisit-time-diverse-dawn-to-dusk-satellite-constellation-with-three-successful-launches-in-three-weeks/ 4. Polymer resins that have reduced flammability typically leave more char when burned. ASTM E662-21ae1 Standard Test Method for Specific Optical Density of Smoke Generated by Solid Materials. https://www.astm.org/e0662-21ae01.html OBJECTIVE: Develop a non-toxic sticky foam material capable of expanding and sticking to targets to non-lethally entangle, restrain, and disable them. REFERENCES: The Phase II proposal is optional for the Phase I awardee. Multiple demonstrations in operationally relevant environments should be planned, including in coordination with a larger research field exercise. The most sensitive OPMs require extensive magnetic shielding [2], but recently, scalar gradiometric magnetometers capable of operating in Earths field have been demonstrated with similar sensitivities [3]. The first deliverable of Phase II is to produce prototype hardware based on the electronics and optical design of Phase I. OBJECTIVE: UAS Continuous Time Spectrum Situational Awareness, research topic is to apply the advantages of continuous time signal processing over traditional DSP for advanced Spectrum Situational Awareness. Proposed concepts should seek to advance the state of the art of the design and construction of Group 13 UAVs. Edit the role to specify a component set that includes the connections you want for the default installation. Proc. 2. Pulse can have multiple simultaneous connections so the -url argument is required when you use -signout, -suspend, or -resume. https://www.futuremedicine.com/doi/10.2217/cnc-2017-0006; The intent of this effort is to address the capability gaps identified for the current workflow. (2) Near real-time response response and alarms, if necessary, in less than one minute of detector(s) on site clearance perpendicular to the connector. This system is expected to support an internal payload of 150 lb (158.76 kg) in weight, have a length less than 15 ft (4.57 m), and an overall system mass less than 2000 lb (907.18 kg). It is therefore, urgent to develop a modeling tool or system to predict the blast injuries in order to support the warfighters. Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the technical data under US Export Control Laws. Host Checker. https://www.esd.whs.mil/portals/54/documents/dd/issuances/dodm/522022m.pdf 10, October 2020, pp. DESCRIPTION: Active imaging systems all require the detection of reflected light, usually through an active source such as a laser. PHASE I: In Phase I, the investigation shall explore the underlying technologies used to enable an EM skin within the frequency range of 2-18 GHz. NIRS devices designed previously, eg. "We will update PPS timelines as soon as it becomes available." PHASE I: Phase I will consist of a full process flow including energy usage and waste generation. 1. This analysis is critical to the success or failure of the Smart-warehouse concept; it must be documented, actionable, measurable, testable, traceable, related to DLAs identified business needs or opportunities, and defined to a level of detail sufficient for the system design. Source: extension://efaidnbmnnnibpcajpcglclefindmkaj/https://www.dla.mil/Portals/104/Documents/Headquarters/StrategicPlan/DLAStrategicPlan2021-2026.pdf Work produced in Phase II may become classified. Lightweight materials are those that advance the state of the art by making use of novel lightweight/high-strength materials and manufacturing technologies, to ensure the final part meets or improves design performance requirements and service life. PHASE II: The project will produce 10-100 rubidium or cesium vapor cells of a high-aspect-ratio rectangular geometry to a government laboratory for testing. 10. Annu. AR could supplement this training by utilizing a visible, constructive, formation partner in early stages of training instead of relying on another live aircraft, improving safety by avoiding possibilities of mid-air collisions while lowering overhead costs associated with utilizing multiple aircraft for training, ultimately reducing overall training time and cost by re-allocating live flight resources to other student naval aviators (SNAs) and events.